Westhall Farm

Westhall Farm
Location: 
Couper
Stage: 
Operational
Featured Technology: 
Wind
The african hardwood doors on the electrical substation were a surprise and a huge additional cost to the project.
Download a Project Report
over_rankeilour_farm.pdf

In More Detail

Details of Project: 

23 February 2015

Wind, Biomass and Heat Pumps

Ian Crombie, Woodhall Farm of Over Rankeilour Farms, near Cupar, Fife, KY15 4NA

This open day consisted of a visit to a 150kW biomass boiler, a 225kW wind turbine and a 24kW heat pump.  The 150kW biomass boiler is a Herz boiler which provides heat to the farm house, office and two properties for seasonal workers. The 225KW wind turbine is an A27 ACSA turbine and has been operational for over a year.  The export capacity on this turbine is limited to 150kW due to grid network constraints, excess electricity is used on the farm to dry woodchip via a bespoke drying system which will also be on display.  As part of the open day, specific focus was given to the grid connection constraints on the wind project, the SSE (SHEPD) design requirements and the novel solution of using excess electricity on the farm in order not to breach the SSE (SHEPD) export constraints. 

Latest Updates

Previous Event

16th December 2015
Cronan Farm

Wednesday 16th December

Battery Storage, Solar, Grid Connections, Energy Optimisation and LED lighting